Fire Alarm Safety Testing

The maintenance, inspection and testing of the building fire alarm system is presently carried out by external contractor, Trinity, and follows the code of practice for system design, installation and servicing provided in the latest edition of BS5839 Part 1 'Detection and Alarm Systems for Buildings.

Weekly and Monthly Fire Alarm Testing

Each fire alarm system in every building across the campus is required to be tested on a weekly or monthly basis to meet safety standards. The alarm will sound for 10 to 15 seconds per test in each area as scheduled below. There may be a number of exceptions to this rule in some buildings where the system is interlinked. For example, in larger buildings, the alarm may sound more than once (10 to 15 seconds per test) throughout the period of testing.

Tuesdays

Building Approx Test Time Weekly or Monthly
Management School 7.00am - 9.00am Monthly
West Pavilion A & E Floor 7.00am - 9.00am Monthly
LEC Main 7.30am - 9.00am Monthly
LEC Bio 7.30am - 9.00am Monthly
LEC 3 7.30am -9.00am Monthly
Sports Centre 7.30am - 9.00am Monthly
HR 8.30am - 10.00am Monthly
Chaplaincy 8.30am - 10.00am Monthly
Security 8.30am - 10.00am Monthly
Furness College 8.30am - 10.00am Weekly
Ruskin Library 9.00am -10.00am Monthly
Furness Residences 10.00am - 12.00pm Weekly
Maintenance Workshop 10.00am - 12.00pm Monthly
Energy Centre 10.00am - 12.00pm Monthly
Bowland College 10.00am - 12.00pm Weekly
Bowland Tower 10.00am - 12.00pm Weekly
Bowland North 12.00pm onwards Weekly
Bowland Annexe 12.00pm onwards Monthly
Bowland Hall Houses 1 to 15 12.00pm onwards Weekly
Chancellors Wharf 12.00pm onwards Weekly

Wednesdays

Building Approx Test Time Weekly or Monthly
Lancaster House Conference Centre 7.00am - 11.00am Monthly
Health Innovation Centre 8.00am - 8.30am Monthly
HIC Substation 8.30am -11.00am Monthly
Intake Substation 8.30am -11.00am Monthly
Substation 9 8.30am -11.00am Monthly
Substation 5 8.30am -11.00am Monthly
Substation 7 8.30am -11.00am Monthly

Thursdays

Building Approx Test Time Weekly or Monthly
Physics 7.00 - 8.00am Monthly
Chemistry 7.00 - 8.00am Monthly
Faraday 7.00 - 8.00am Monthly
Pre School 8.00am Monthly
Main Library 8.00am-8.30am Monthly
Uni House 8.00am-8.30am Monthly
Great Hall 8.30am Monthly
Whewell 9.00am Monthly
LICA Building 9.00am-10.00am Monthly
Round House 9.00am-10.00am Monthly
Ash House 9.00am-10.00am Weekly
Bailrigg 9.00am-10.00am Monthly
John Creed Blocks 10.00am Weekly
County South/FHASS 10.00 - 12.00pm Weekly
FST 10.00 - 12.00pm Monthly
Engineering One 10.00 - 12.00pm Monthly
Engineering Two 10.00 - 12.00pm Monthly
George Fox 10.00 - 12.00pm Weekly
Charles Carter 10.00 - 12.00pm Monthly
Pendle Porters 10.00 - 12.00pm Weekly
Pendle Block 6 10.00 - 12.00pm Weekly
Pendle Bar 10.00 - 12.00pm Monthly
ISS 11.00 - 11.30am Monthly
Grizedale 12.00pm Weekly
InfoLab 12.00pm onwards Monthly
Graduate College Houses 1 to 11 12.00pm onwards Weekly
Barker House Farm 12.00pm onwards Monthly
Fylde 12.00pm onwards Weekly
Post Grad Stats 12.00pm onwards Monthly
Forrest Hills 2.00pm Monthly

Annual Fire Device Safety Testing

The fire alarm systems in the following buildings will be tested on the following dates. This is the annual ‘C testing’ which is essential to maintain high standards of safety.

Please note this is additional testing to the monthly alarm and door release testing.

  • Engineering One, 03 February 2025
  • Life Sciences and Environment Laboratories, 03 February 2025
  • Main Substation, 03 March 2025
  • Charles Carter Building, 05 May 2025
  • LEC 1 and 2, 05 May 2025
  • Sports Centre, 30 June 2025
  • Alexandra Park Laundrette, 04 August 2025
  • Barker House Farm, 04 August 2025
  • Furness Residences, 04 August 2025
  • Health Innovation One, 04 August 2025
  • Chemistry Building,04 August 2025
  • Chemistry Building, 04 August 2025
  • Welcome Centre, 01 September 2025
  • Faraday Complex. 01 September 2025
  • Bowland Tower, 01 September 2025
  • Energy Centre, 01 September 2025
  • Furness College, 01 September 2025
  • Science and Technology, 01 September 2025
  • Bowland South, 01 September 2025
  • Slaidburn House, 01 September 2025
  • Pre-School Centre, 01 September 2025
  • LEC 3, 01 September 2025
  • Whewell Building, 01 September 2025
  • Security Lodge, 01 September 2025
  • Lancaster Conference Centre, 01 September 2025
  • Fylde College, 01 September 2025
  • CEH, 01 September 2025
  • Bowland Hall Residences, 01 September 2025
  • InfoLab21, 01 September 2025
  • House 08 - Derwentwater, Graduate College, 01 September 2025
  • Bowland Main, 01 September 2025
  • Physics Building, 01 September 2025
  • Bowland ASH House, 01 September 2025
  • Faculty of Humanities, Arts and Social Sciences Building, 01 September 2025
  • Pendle College, Foulridge (9), 01 September 2025
  • House 06 - Coniston, Graduate College, 01 September 2025
  • House 04 - Burnmoor, Graduate College, 01 September 2025
  • House 09 - Devoke, Graduate College, 01 September 2025
  • Pendle College, Bracewell (5), 01 September 2025
  • Bowland North, 01 September 2025
  • House 07 - Crummock Water, Graduate College, 01 September 2025
  • House 05 - Buttermere, Graduate College, 01 September 2025
  • House 03 - Brotherswater, Graduate College, 01 September 2025
  • House 11 - Ennerdale, Graduate College, 01 September 2025
  • County John Creed, 01 September 2025
  • House 10 - Elterwater, Graduate College, 01 September 2025
  • The Ruskin, 01 September 2025
  • House 02 - Blea House, Graduate College, 01 September 2025
  • Pendle College, Barrowford (3), 01 September 2025
  • House 01 - Bassenthwaite, Graduate College, 01 September 2025
  • Central Workshops, 01 September 2025
  • University House, 01 September 2025
  • Library, 01 September 2025
  • Management School, 01 September 2025
  • George Fox Building, 01 September 2025
  • Chaplaincy Centre, 01 September 2025
  • County South, 01 September 2025
  • Music Building, 01 September 2025
  • Bowland Annexe, 01 September 2025
  • Bowland Hall, 01 September 2025
  • Great Hall Complex, 01 September 2025
  • Bowland Annexe, 01 September 2025
  • The Roundhouse, 01 September 2025
  • Bailrigg House, 01 September 2025
  • PSC, 01 September 2025
  • Chancellor's Wharf, 01 September 2025
  • Pendle College, Nelson (13), 01 September 2025
  • Pendle College, Higham (11), 01 September 2025
  • Grizedale College, Salterforth (17), 01 September 2025
  • Pendle College, Padiham (15), 01 September 2025
  • Pendle College, Earby (8), 01 September 2025
  • Grizedale College, Trawden (18), 01 September 2025
  • Pendle College, Greenberfield (10), 01 September 2025
  • Grizedale College, Roughlee (16), 01 September 2025
  • Pendle College, Kelbrook (12), 01 September 2025
  • Pendle College, Colne (7), 01 September 2025
  • Pendle College, Barley (2), 01 September 2025
  • Pendle Block 01, Bar, 01 September 2025
  • Pendle College, Coldwell (6), 01 September 2025
  • Pendle College, Boulsworth (4), 01 September 2025
  • ISS Building, 01 September 2025
  • LICA, 01 September 2025
  • Pendle Block 01, Bar, 01 September 2025
  • HR Building, 01 September 2025
  • Sub Station 9, 01 September 2025
  • Faraday Complex, 01 September 2025
  • CEH, 01 September 2025
  • Main Campus, 01 September 2025
  • Forrest Hills, 01 September 2025
  • Engineering One, 02 February 2026
  • Life Sciences and Environment Laboratories, 02 February 2026
  • Main Substation, 02 March 2026
  • Charles Carter Building, 04 May 2026
  • LEC 1 and 2, 04 May 2026

Two engineers from ‘Trinity’ will require access to every room that has a fire alarm device in it. This will cause very little disruption while testing the devices but at the end of the testing they will need to carry out a sound test which will only take a couple of seconds. We apologise for any inconvenience this may cause.

If you have any queries regarding the timing of this work, please contact the Facilities Helpdesk.